Start with the coverage question
Identify the hazards relevant to each property and review building characteristics with qualified professionals where needed. Roof age, construction, protective features, seismic characteristics, and location can affect the insurance discussion. Distinguish the physical hazard from the wording that defines an insured event; those are related but separate considerations.
Coverage decisions to examine
Read the deductible basis carefully. A percentage may apply to a defined insured value rather than to the amount of the loss. Minimums, maximums, per-building treatment, occurrence definitions, and time clauses can change the calculation. Earthquake, all wind, named storm, and hail may not use the same structure or coverage terms.
Values, income & recovery
Ask for illustrative calculations using the actual proposed values and endorsements. A single regional event could create retained costs at several buildings, so model portfolio effects rather than only one location. Consider roof settlement limitations and catastrophe sublimits in addition to the deductible. These exercises inform budgeting; actual adjustment follows the policy and loss facts.
Prepare the underwriting file
Use the actual forms and account details to evaluate the proposed protection. A coverage label or limit alone does not establish the result. Identify the exposure, relevant insured entities, applicable conditions, and supporting records before comparing options with the broker.
- Current building values by location and coverage component
- Complete catastrophe deductible and occurrence endorsements
- Roof and structural information with relevant inspection reports
- Geographic concentration and liquidity available for retained losses
Put the review into practice
Compare competing quotes using the same event assumptions and property values. Record which components of value enter the deductible calculation and whether income coverage is included. Discuss changes in deductibles at renewal explicitly, especially when a premium reduction reflects greater retained risk. Confirm lender acceptance of the offered terms through the lender’s actual review process.
Questions to bring to your review
Does a five-percent deductible mean five percent of the claim?
Not necessarily. The endorsement specifies the calculation base. It may refer to insured property values or another defined amount, making the result much larger than a percentage of a small claim.
Is named-storm coverage identical to wind coverage?
No. Definitions, triggers, exclusions, and deductible treatment vary. Review the actual policy language instead of treating the terms as interchangeable.
Educational information only. Actual policy wording, underwriting and applicable jurisdiction govern. Reviewed October 27, 2026.
